{"id":20967,"date":"2025-04-01T12:44:22","date_gmt":"2025-04-01T07:14:22","guid":{"rendered":"https:\/\/www.nimblework.com\/knowledge-base\/nimble\/?post_type=article&#038;p=20967"},"modified":"2025-04-02T17:59:54","modified_gmt":"2025-04-02T12:29:54","slug":"task-field-accessibility","status":"publish","type":"article","link":"https:\/\/www.nimblework.com\/knowledge-base\/nimble\/article\/task-field-accessibility\/","title":{"rendered":"Read-Only Fields in Task Grid"},"content":{"rendered":"<h2 style=\"text-align: left;\">Overview<\/h2>\n<p class=\"\" data-start=\"105\" data-end=\"465\">In the <strong data-start=\"112\" data-end=\"125\">Task Grid<\/strong>, some fields are read-only based on factors such as task type, scheduling mode, and other predefined conditions. These read-only fields appear <strong data-start=\"269\" data-end=\"283\">grayed out<\/strong>, indicating that they cannot be modified. Additionally, when you hover over a read-only field, a <strong data-start=\"381\" data-end=\"395\">block icon<\/strong> appears along with a tooltip explaining why the field is read-only.<\/p>\n<p class=\"\" data-start=\"467\" data-end=\"596\">This visual and contextual feedback helps you understand field behavior within the Task Grid, ensuring clarity and ease of use.<\/p>\n<h2 style=\"text-align: left;\">How It Works<\/h2>\n<p>When you&#8217;re in checked-in mode, you might come across fields that are not editable even when double-clicking. These fields appear grayed out with a block icon, and a tooltip explains why they are read-only and non-editable. This makes it easier for you while working on tasks.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-21000 size-full alignleft\" src=\"https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-content\/uploads\/2025\/04\/TaskTooltipmessage.png\" alt=\"Task Tooltip message\" width=\"2844\" height=\"828\" srcset=\"https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-content\/uploads\/2025\/04\/TaskTooltipmessage.png 2844w, https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-content\/uploads\/2025\/04\/TaskTooltipmessage-300x87.png 300w, https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-content\/uploads\/2025\/04\/TaskTooltipmessage-1024x298.png 1024w, https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-content\/uploads\/2025\/04\/TaskTooltipmessage-768x224.png 768w, https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-content\/uploads\/2025\/04\/TaskTooltipmessage-1536x447.png 1536w, https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-content\/uploads\/2025\/04\/TaskTooltipmessage-2048x596.png 2048w\" sizes=\"(max-width: 2844px) 100vw, 2844px\" \/><\/p>\n<h2 style=\"text-align: left;\">Read-Only Fields Messages<\/h2>\n<h4><span style=\"color: #ffcc00;\">1. Scheduling Type: <strong>Simple Scheduling;<\/strong>\u00a0Task Actuals Tracking Mode: <strong>Based on Timesheet<\/strong><\/span><\/h4>\n<table style=\"width: 100%; height: 720px;\">\n<tbody>\n<tr style=\"height: 20px;\">\n<th style=\"height: 20px;\">Column<\/th>\n<th style=\"height: 20px;\">Condition<\/th>\n<th style=\"height: 20px;\">Tooltip Message<\/th>\n<\/tr>\n<tr style=\"height: 20px;\">\n<td style=\"height: 20px; text-align: left;\">Planned Duration (Hrs.)<\/td>\n<td style=\"height: 20px; text-align: left;\">Always<\/td>\n<td style=\"height: 20px; text-align: left;\">Planned Duration (Hrs.) is read-only as it is derived from Planned Start and Finish dates.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; text-align: left;\">Planned Start<\/td>\n<td style=\"height: 40px; text-align: left;\">For Summary Tasks<\/td>\n<td style=\"height: 40px; text-align: left;\">Planned Start is read-only as dates for Summary Task are derived from its child Tasks.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; text-align: left;\">Planned Finish<\/td>\n<td style=\"height: 40px; text-align: left;\">For Summary Tasks<\/td>\n<td style=\"height: 40px; text-align: left;\">Planned Finish is read-only as dates for Summary Task are derived from its child Tasks.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; text-align: left;\">Predecessor<\/td>\n<td style=\"height: 40px; text-align: left;\">For Summary Tasks<\/td>\n<td style=\"height: 40px; text-align: left;\">Predecessor is read-only as Summary Task cannot have dependencies.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; text-align: left;\">Resources<\/td>\n<td style=\"height: 40px; text-align: left;\">For Summary Tasks<\/td>\n<td style=\"height: 40px; text-align: left;\">Resources is read-only as Summary Task cannot have resource assignments.<\/td>\n<\/tr>\n<tr style=\"height: 80px;\">\n<td style=\"height: 80px; text-align: left;\">Planned Hours<\/td>\n<td style=\"height: 80px; text-align: left;\">Always<\/td>\n<td style=\"height: 80px; text-align: left;\"><strong>Normal Task:<\/strong> Planned Hours is read-only as it is based on resource assignment from the Planned Start to the Finish dates.<br \/>\n<strong>Summary Task:<\/strong> Planned Hours is read-only as Hours for Summary Task is derived from its child Tasks.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; text-align: left;\">% Work Complete<\/td>\n<td style=\"height: 40px; text-align: left;\">Always<\/td>\n<td style=\"height: 40px; text-align: left;\">Percent Work Complete is read-only as it is percentage of Actual Hours compared to Planned Hours.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; text-align: left;\">Actual Finish<\/td>\n<td style=\"height: 40px; text-align: left;\">Always<\/td>\n<td style=\"height: 40px; text-align: left;\">Actual Finish is read-only as it is based on the last date on which logged hours is approved.<\/td>\n<\/tr>\n<tr style=\"height: 20px;\">\n<td style=\"height: 20px; text-align: left;\">Actual Hours<\/td>\n<td style=\"height: 20px; text-align: left;\">Always<\/td>\n<td style=\"height: 20px; text-align: left;\">Actual Hours is read-only as it is based on the logged hours approved in the Timesheet.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; text-align: left;\">Actual Start<\/td>\n<td style=\"height: 40px; text-align: left;\">Always<\/td>\n<td style=\"height: 40px; text-align: left;\">Actual Start is read-only as it is based on the first date on which logged hours is approved.<\/td>\n<\/tr>\n<tr style=\"height: 20px;\">\n<td style=\"height: 20px; text-align: left;\">Baseline Finish<\/td>\n<td style=\"height: 20px; text-align: left;\">Always<\/td>\n<td style=\"height: 20px; text-align: left;\">Baseline Finish is read-only as it is based on Current Baseline.<\/td>\n<\/tr>\n<tr style=\"height: 20px;\">\n<td style=\"height: 20px; text-align: left;\">Baseline Hours<\/td>\n<td style=\"height: 20px; text-align: left;\">Always<\/td>\n<td style=\"height: 20px; text-align: left;\">Baseline Hours is read-only as it is based on Current Baseline.<\/td>\n<\/tr>\n<tr style=\"height: 20px;\">\n<td style=\"height: 20px; text-align: left;\">Baseline Start<\/td>\n<td style=\"height: 20px; text-align: left;\">Always<\/td>\n<td style=\"height: 20px; text-align: left;\">Baseline Start is read-only as it is based on Current Baseline.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; text-align: left;\">Due Date<\/td>\n<td style=\"height: 40px; text-align: left;\">For Summary Tasks<\/td>\n<td style=\"height: 40px; text-align: left;\">Due Date is read-only as it is updated based on the last child task&#8217;s Planned Finish date.<\/td>\n<\/tr>\n<tr style=\"height: 20px;\">\n<td style=\"height: 20px; text-align: left;\">Overall Status<\/td>\n<td style=\"height: 20px; text-align: left;\">Always<\/td>\n<td style=\"height: 20px; text-align: left;\">Overall Status is read-only as it is updated based on % Work Complete.<\/td>\n<\/tr>\n<tr style=\"height: 20px;\">\n<td style=\"height: 20px; text-align: left;\">Owner<\/td>\n<td style=\"height: 20px; text-align: left;\">Always<\/td>\n<td style=\"height: 20px; text-align: left;\">Owner is read-only as it is updated based on the resource assignments.<\/td>\n<\/tr>\n<tr style=\"height: 20px;\">\n<td style=\"height: 20px; text-align: left;\">Phase<\/td>\n<td style=\"height: 20px; text-align: left;\">Always<\/td>\n<td style=\"height: 20px; text-align: left;\">Phase is read-only as it is based on the Practice chosen for generating the Tasks.<\/td>\n<\/tr>\n<tr style=\"height: 20px;\">\n<td style=\"height: 20px; text-align: left;\">Practice<\/td>\n<td style=\"height: 20px; text-align: left;\">Always<\/td>\n<td style=\"height: 20px; text-align: left;\">Practice is read-only as it is based on the Practice chosen for generating the Tasks.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; text-align: left;\">Remaining Hours<\/td>\n<td style=\"height: 40px; text-align: left;\">Always<\/td>\n<td style=\"height: 40px; text-align: left;\">Remaining Hours is read-only as it is the difference between the Planned and Actual Hours.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; text-align: left;\">Overall Status is Closed (Entire row)<\/td>\n<td style=\"height: 40px; text-align: left;\"><\/td>\n<td style=\"height: 40px; text-align: left;\">Action cannot be performed on closed Task.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; text-align: left;\">Overall Status is Blocked (Entire Row)<\/td>\n<td style=\"height: 40px; text-align: left;\"><\/td>\n<td style=\"height: 40px; text-align: left;\">Action cannot be performed on blocked Task.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h4>2. Scheduling Type: <strong>Simple Scheduling;<\/strong>\u00a0Task Actuals Tracking Mode: <strong>Manual<\/strong><\/h4>\n<table>\n<tbody>\n<tr>\n<th>Column<\/th>\n<th>Condition<\/th>\n<th>Tooltip Message<\/th>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Planned Duration (Hrs.)<\/td>\n<td style=\"text-align: left;\">Always<\/td>\n<td style=\"text-align: left;\">Planned Duration (Hrs.) is read-only as it is derived from Planned Start and Finish dates.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Planned Start<\/td>\n<td style=\"text-align: left;\">For Summary Tasks<\/td>\n<td style=\"text-align: left;\">Planned Start is read-only as dates for Summary Tasks are derived from its child tasks.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Planned Finish<\/td>\n<td style=\"text-align: left;\">For Summary Tasks<\/td>\n<td style=\"text-align: left;\">Planned Finish is read-only as dates for Summary Tasks are derived from its child tasks.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Resources<\/td>\n<td style=\"text-align: left;\">For Summary Tasks<\/td>\n<td style=\"text-align: left;\">Resources is read-only as a Summary Task cannot have resource assignments.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Planned Hours<\/td>\n<td style=\"text-align: left;\">Always<\/td>\n<td style=\"text-align: left;\">Planned Hours is read-only as it is based on resource assignments from the Planned Start to the Finish dates.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">% Work Complete<\/td>\n<td style=\"text-align: left;\">For Summary Tasks<\/td>\n<td style=\"text-align: left;\">Percent Work Complete is read-only as it is the percentage of Actual Hours compared to Planned Hours.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Actual Finish<\/td>\n<td style=\"text-align: left;\">For Summary Tasks<\/td>\n<td style=\"text-align: left;\">Actual Finish is read-only as it is derived from its child tasks.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Actual Hours<\/td>\n<td style=\"text-align: left;\">No Resource Assigned and For Summary Tasks<\/td>\n<td style=\"text-align: left;\"><strong>No Resource Assigned:<\/strong> Actual Hours is read-only as it requires a resource assignment.<br \/>\n<strong>Summary Tasks:<\/strong> Actual Hours is read-only as it is derived from its child tasks.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Actual Start<\/td>\n<td style=\"text-align: left;\">For Summary Tasks<\/td>\n<td style=\"text-align: left;\">Actual Start is read-only as it is derived from its child tasks.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Baseline Finish<\/td>\n<td style=\"text-align: left;\">Always<\/td>\n<td style=\"text-align: left;\">Baseline Finish is read-only as it is based on the current baseline.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Baseline Hours<\/td>\n<td style=\"text-align: left;\">Always<\/td>\n<td style=\"text-align: left;\">Baseline Hours is read-only as it is based on the current baseline.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Baseline Start<\/td>\n<td style=\"text-align: left;\">Always<\/td>\n<td style=\"text-align: left;\">Baseline Start is read-only as it is based on the current baseline.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Due Date<\/td>\n<td style=\"text-align: left;\">For Summary Tasks<\/td>\n<td style=\"text-align: left;\">Due Date is read-only as it is updated based on the latest child task&#8217;s Planned Finish date.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Overall Status<\/td>\n<td style=\"text-align: left;\">Always<\/td>\n<td style=\"text-align: left;\">Overall Status is read-only as it is updated based on % Work Complete.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Owner<\/td>\n<td style=\"text-align: left;\">Always<\/td>\n<td style=\"text-align: left;\">Owner is read-only as it is updated based on resource assignments.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Phase<\/td>\n<td style=\"text-align: left;\">Always<\/td>\n<td style=\"text-align: left;\">Phase is read-only as it is based on the practice chosen for generating the tasks.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Practice<\/td>\n<td style=\"text-align: left;\">Always<\/td>\n<td style=\"text-align: left;\">Practice is read-only as it is based on the practice chosen for generating the tasks.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Remaining Hours<\/td>\n<td style=\"text-align: left;\">Always<\/td>\n<td style=\"text-align: left;\">Remaining Hours is read-only as it is the difference between Planned and Actual Hours.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Overall Status is Closed (Entire row except PCOMP and ACT_FN)<\/td>\n<td style=\"text-align: left;\">&#8211;<\/td>\n<td style=\"text-align: left;\">This task is closed and hence not available for editing. To edit its details, re-open it first by reducing the % Work Complete to less than 100%.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Overall Status is Blocked (Entire Row)<\/td>\n<td style=\"text-align: left;\">&#8211;<\/td>\n<td style=\"text-align: left;\">Action cannot be performed on a blocked task.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h4>3. Scheduling Type: <strong>Advanced\u00a0Scheduling;<\/strong>\u00a0Task Actuals Tracking Mode: <strong>Based on timesheet data<\/strong><\/h4>\n<table style=\"width: 100%;\">\n<tbody>\n<tr>\n<th style=\"width: 10.7658%;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Column<\/span><\/th>\n<th style=\"width: 10.4329%;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Condition<br \/>\nfor Read-Only<\/span><\/th>\n<th style=\"width: 20.3108%;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Reason<br \/>\nfor Read-Only<\/span><\/th>\n<th style=\"width: 57.1587%;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Tooltip<br \/>\nMessage<\/span><\/th>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Planned<br \/>\nDuration (Hrs.)<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nFixedDates task,<br \/>\nFor summary tasks,<br \/>\nFor Milestones, &amp;<br \/>\nFor Linked Plan<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Fixed Dates:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Duration (Hrs.) is read-only as it is derived from Planned Start and Finish dates.<br \/>\n<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Summary Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Duration (Hrs.) is read-only as the duration for a Summary Task is derived from its child Tasks.<br \/>\n<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Milestone Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Duration (Hrs.) is read-only as it is derived from Planned Start and Finish dates.<\/span><br \/>\n<span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Linked Plan Task<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">: Planned Duration (Hrs.) is read-only as the duration for a Linked Plan Task is derived from its linked Task Plan.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Planned<br \/>\nStart<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks, &amp;<br \/>\nFor Linked Plan<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Summary Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Start is read-only<br \/>\nas dates for Summary Task are derived from its child Tasks.<br \/>\n<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Linked Plan Task: <\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Planned Start is read-only as dates for Linked Plan Task are derived from its linked Task Plan.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Planned<br \/>\nFinish<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks, &amp;<br \/>\nFor Linked Plan<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Summary Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Finish is read-only as dates for Summary Task are derived from its child Tasks.<br \/>\n<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Linked Plan Task: <\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Planned Finish is read-only as dates for Linked Plan Task are derived from its child Tasks.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Planned<br \/>\nHours<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks,<br \/>\nFor Milestone, &amp; For Linked Plan<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Normal Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Hours is read-only as it is based on resource assignment from the Planned Start to the Finish dates. <\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Summary Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Hours is read-only as Hours for Summary Task is derived from its child Tasks.<br \/>\n<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Milestone Task: <\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Planned Hours is read-only as Milestone Task cannot have resource assignments.<\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Linked Plan Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Hours is read-only as Hours for Linked Plan Task is derived from its child Tasks.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Remaining<br \/>\nHours<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Remaining Hours is read-only as it is percentage of Actual Hours compared<br \/>\nto Planned Hours.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Resources<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks,<br \/>\nFor Milestone, For Hybrid, &amp;<\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nLinked Plan<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Summary Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Resources is read-only as Summary Task cannot have resource assignments. <\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Milestone Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Resources is read-only as Milestone Task have zero Hours and zero duration Tasks.<br \/>\n<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Hybrid Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Resources is read-only as Hybrid Task cannot have resource assignments.<\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Linked Plan Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Resources is read-only as Linked Plan Task cannot have resource assignments.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Actual<br \/>\nHours<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Actual Hours is read-only as it is based on the logged hours approved in the Timesheet.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Actual<br \/>\nStart<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Actual Start is read-only as it is based on the first date on which logged hours is approved.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Actual<br \/>\nFinish<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Actual Finish is read-only as it is based on the last date on which logged hours is approved.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Priority<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<br \/>\nEditable<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Not<br \/>\nApplicable<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Not Applicable<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Predecessor<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nHybrid,&amp;<br \/>\nFor Linked Plan<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Hybrid Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Predecessor is read-only as Hybrid Task cannot have dependencies.<\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Linked Plan Task<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">: Predecessor is read-only as Linked Plan Task cannot have dependencies.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Task<br \/>\nMode<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Task Mode is read-only as it is a Summary Task.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Task<br \/>\nType<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks, &amp;<br \/>\nFor manually scheduled<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Summary Task<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">: Task Type is read-only as it is a Summary Task. <\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Manually Scheduled Task: <\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Task Type is not applicable as Task Mode is manually scheduled.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Entire<br \/>\nTask Row<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nClosed Tasks<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Action cannot be performed on closed Task.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 10.7658%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Entire<br \/>\nTask Row<\/span><\/td>\n<td style=\"width: 10.4329%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 20.3108%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nBlocked Tasks<\/span><\/td>\n<td style=\"width: 57.1587%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Action cannot be performed on blocked Task.<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h4>3. Task Module: <strong>STaRT Plus<\/strong> &amp; Task Actuals Tracking Mode: <strong>Manual<\/strong><\/h4>\n<table style=\"width: 100%;\">\n<tbody>\n<tr>\n<th style=\"text-align: center; width: 11.9867%;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Column<\/span><\/th>\n<th style=\"text-align: center; width: 11.7647%;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Condition<br \/>\nfor Read-Only<\/span><\/th>\n<th style=\"text-align: center; width: 14.7614%;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Reason<br \/>\nfor Read-Only<\/span><\/th>\n<th style=\"text-align: center; width: 60.1554%;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Tooltip<br \/>\nMessage<\/span><\/th>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Planned<br \/>\nDuration (Hrs.)<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nFixedDates task and<br \/>\nnot manually scheduled,<br \/>\nFor summary tasks,<br \/>\nFor Milestones, &amp;<br \/>\nFor Linked Plan<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Fixed Dates:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Duration (Hrs.) is read-only as it is derived from Planned Start and Finish dates.<\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Summary Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Duration (Hrs.) is read-only as the duration for a Summary Task is derived from its child Tasks. <\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Milestone Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Duration (Hrs.) is read-only as it is derived from Planned Start and Finish dates. <\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Linked Plan Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Duration (Hrs.) is read-only as the duration for a Linked Plan Task is derived from its linked Task Plan.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Planned<br \/>\nStart<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks, &amp;<br \/>\nFor Linked Plan<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Summary Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Start is read-only as dates for Summary Task are derived from its child Tasks. <\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Linked Plan Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Start is read-only as dates for Linked Plan Task are derived from its linked Task Plan.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Planned<br \/>\nFinish<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks, &amp;<br \/>\nFor Linked Plan<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Summary Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Finish is read-only as dates for Summary Task are derived from its child Tasks. <\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Linked Plan Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Finish is read-only as dates for Linked Plan Task are derived from its linked Task Plan.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Planned<br \/>\nHours<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks,<br \/>\nFor Milestone, &amp;<br \/>\nFor Linked Plan<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Normal Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Hours is read-only as it is based on resource assignment from the Planned Start to the Finish dates. <\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Summary Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Hours is read-only as Hours for Summary Task is derived from its child Tasks. <\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Milestone Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Hours is read-only as Milestone Task cannot have resource assignments.<\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Linked Plan Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Planned Hours is read-only as Hours for Linked Plan Task is derived from its linked Task Plan.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Remaining<br \/>\nHours<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Remaining Hours is read-only as it is auto calculated based on Planned and Actual Hours.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Resources<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks,<br \/>\nFor Milestone,<br \/>\nFor Hybrid, &amp;<br \/>\nFor Linked Plan<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Summary Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Resources is read-only as Summary Task cannot have resource assignments. <\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Milestone Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Resources is read-only as Milestone Task have zero Hours and zero duration Tasks. <\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Hybrid Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Resources is read-only as Hybrid Task cannot have resource assignments.<\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Linked Plan Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Resources is read-only as Linked Plan Task cannot have resource assignments.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Actual<br \/>\nHours<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">No<br \/>\nresource assigned<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">No<br \/>\nresource assigned<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Actual Hours is read-only as resource assignments are required for recording Actual Hours.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Actual<br \/>\nStart<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Actual Start is read-only as it is derived from its child Tasks.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Actual<br \/>\nFinish<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Actual Finish is read-only as it is derived from its child Tasks.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Percent<br \/>\nWork Complete<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nSummary Tasks<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Percent Work Complete is read-only as it is derived from its child Tasks.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Overall<br \/>\nStatus<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Overall Status is read-only as it is updated based on % Work Complete.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Predecessor<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nHybrid, &amp;<br \/>\nFor Linked Plan<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Hybrid Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Predecessor is read-only as Summary Task cannot have dependencies. <\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Linked Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Predecessor is read-only as Linked Task Plan cannot have dependencies.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Actual<br \/>\nCost<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Actual Cost is read-only as it is calculated based on Actual Hours and resource cost per hour.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Baseline<br \/>\nCost<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Baseline Cost is read-only as it is based on Current Baseline.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Baseline<br \/>\nDuration<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Baseline Duration is read-only as it is based on Current Baseline.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Baseline<br \/>\nHours<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Baseline Hours is read-only as it is based on Current Baseline.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Baseline<br \/>\nFinish<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Baseline Finish is read-only as it is based on Current Baseline.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Baseline<br \/>\nStart<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Baseline Start is read-only as it is based on Current Baseline.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Mark<br \/>\nTask as Milestone<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">For<br \/>\nHybrid, &amp;<br \/>\nFor Linked Plan<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Hybrid Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Mark Task as Milestone is read-only as a Hybrid Task cannot be converted into a Milestone Task. <\/span><br \/>\n<!--?rh-implicit_p?--><span style=\"font-size: 11pt; font-family: Calibri, sans-serif; font-weight: bold;\">Linked Plan Task:<\/span><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\"> Mark Task as Milestone is read-only as a Linked Plan Task cannot be converted into a Milestone Task.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Planned<br \/>\nCost<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Planned Cost is read-only as it is calculated based on Planned Hours<br \/>\nand resource cost per hour.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Practice<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Practice is read-only as it is based on the Practice chosen for generating the Tasks.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Standard<br \/>\nCode<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nDynamic<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\">&#8211;<\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Standard code of Deliverable tasks are non-editable.<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 11.9867%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">WBS<br \/>\nCode<\/span><\/td>\n<td style=\"width: 11.7647%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Read-Only<br \/>\nAlways<\/span><\/td>\n<td style=\"width: 14.7614%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Always<\/span><\/td>\n<td style=\"width: 60.1554%; text-align: left;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">NA<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h4>4. Default Scheduling (Live Editing)<\/h4>\n<table style=\"width: 100%; height: 480px;\" border=\"1\">\n<thead>\n<tr style=\"height: 20px;\">\n<th style=\"height: 20px; width: 13.0966%;\">Column<\/th>\n<th style=\"height: 20px; width: 13.4295%;\">Condition<\/th>\n<th style=\"height: 20px; width: 72.364%;\"><span style=\"font-size: 11pt; font-family: Calibri, sans-serif;\">Tooltip<br \/>\nMessage<\/span><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; width: 13.0966%; text-align: left;\">Due Date<\/td>\n<td style=\"height: 40px; width: 13.4295%; text-align: left;\">For Summary Tasks<\/td>\n<td style=\"height: 40px; width: 72.364%; text-align: left;\">Due Date is read-only as due date for Summary Task is updated based on the latest child Task&#8217;s Planned Finish date.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; width: 13.0966%; text-align: left;\">Planned Start<\/td>\n<td style=\"height: 40px; width: 13.4295%; text-align: left;\">For Summary Tasks<\/td>\n<td style=\"height: 40px; width: 72.364%; text-align: left;\">Planned Start is read-only as dates for Summary Task are derived from its child Tasks.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; width: 13.0966%; text-align: left;\">Planned Finish<\/td>\n<td style=\"height: 40px; width: 13.4295%; text-align: left;\">For Summary Tasks<\/td>\n<td style=\"height: 40px; width: 72.364%; text-align: left;\">Planned Finish is read-only as dates for Summary Task are derived from its child Tasks.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; width: 13.0966%; text-align: left;\">Predecessor<\/td>\n<td style=\"height: 40px; width: 13.4295%; text-align: left;\">For Summary Tasks<\/td>\n<td style=\"height: 40px; width: 72.364%; text-align: left;\">Predecessor is read-only as Summary Task cannot have dependencies.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; width: 13.0966%; text-align: left;\">Resources<\/td>\n<td style=\"height: 40px; width: 13.4295%; text-align: left;\">For Summary Tasks<\/td>\n<td style=\"height: 40px; width: 72.364%; text-align: left;\">Resources is read-only as Summary Task cannot have resource assignments.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; width: 13.0966%; text-align: left;\">% Work Complete<\/td>\n<td style=\"height: 40px; width: 13.4295%; text-align: left;\">For Summary Tasks<\/td>\n<td style=\"height: 40px; width: 72.364%; text-align: left;\">Percent Work Complete is read-only as Summary Task cannot have resource assignments.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; width: 13.0966%; text-align: left;\">Actual Finish<\/td>\n<td style=\"height: 40px; width: 13.4295%; text-align: left;\">For Summary Tasks<\/td>\n<td style=\"height: 40px; width: 72.364%; text-align: left;\">Actual Finish is read-only as dates for Summary Task are derived from its child Tasks.<\/td>\n<\/tr>\n<tr style=\"height: 40px;\">\n<td style=\"height: 40px; width: 13.0966%; text-align: left;\">Actual Start<\/td>\n<td style=\"height: 40px; width: 13.4295%; text-align: left;\">For Summary Tasks<\/td>\n<td style=\"height: 40px; width: 72.364%; text-align: left;\">Actual Start is read-only as dates for Summary Task are derived from its child Tasks.<\/td>\n<\/tr>\n<tr style=\"height: 20px;\">\n<td style=\"height: 20px; width: 13.0966%; text-align: left;\">Owner<\/td>\n<td style=\"height: 20px; width: 13.4295%; text-align: left;\">Always<\/td>\n<td style=\"height: 20px; width: 72.364%; text-align: left;\">Owner is read-only as it is updated based on the resource assignments.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<div class=\"helpful-block-content wth-theme-thumbs\" data-title=\"\" >\n<ul>\n<li><span class=\"wth-title\">Was this helpful?<\/span><\/li>\n<li><a data-post=\"20967\" data-post-url=\"https:\/\/www.nimblework.com\/knowledge-base\/nimble\/article\/task-field-accessibility\/\" data-post-title=\"Read-Only Fields in Task Grid\" data-response=\"1\" href=\"#\" class=\"wth-green-btn icon-thumbsup\">Yes<\/a>&nbsp; &nbsp;<a data-response=\"0\" data-post=\"20967\" data-post-url=\"https:\/\/www.nimblework.com\/knowledge-base\/nimble\/article\/task-field-accessibility\/\" data-post-title=\"Read-Only Fields in Task Grid\" href=\"#\" class=\"wth-red-btn icon-thumbsdown\">No<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"author":4,"featured_media":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","multi-rating":{"mr_rating_results":[]},"_links":{"self":[{"href":"https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-json\/wp\/v2\/article\/20967"}],"collection":[{"href":"https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-json\/wp\/v2\/article"}],"about":[{"href":"https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-json\/wp\/v2\/types\/article"}],"author":[{"embeddable":true,"href":"https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-json\/wp\/v2\/comments?post=20967"}],"version-history":[{"count":25,"href":"https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-json\/wp\/v2\/article\/20967\/revisions"}],"predecessor-version":[{"id":21013,"href":"https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-json\/wp\/v2\/article\/20967\/revisions\/21013"}],"wp:attachment":[{"href":"https:\/\/www.nimblework.com\/knowledge-base\/nimble\/wp-json\/wp\/v2\/media?parent=20967"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}