August 21, 2012
Product Updates

Visualizing Cycles in Kanban

At a training session in Kitchener Waterloo, Canada. I was asked how to visualize and handle cycles in a Kanban board. The images below show a way to do it as a physical board and on an electronic board such as Swift Kanban. Tickets within a cycle move from left to right, from one column to the next until and cycle back as many times as necessary and once done they move to the Done column at the the end of the cycle. Note that columns inside the cycle can contain their own Done columns.